- Fabrication, anti-corrosive coating and installation of fire hydrant piping Boiler side from Unit 1 to Unit 6 - ESKOM KRIEL POWER
- Construction of Seepage Drainage Cut-Off Solution at Ash Dams 3 South Eastern corner - ESKOM KRIEL POWER
- Cleaning of Ash line trenches - ESKOM HENDRINA POWER
- Supply, Installation and Commissioning of Pump Protection Relays at Pump Stations- LEPELLE NORTHERN WATER
- Design, Installation and Commissioning of Ultrasonic Flow Meters from Unit 1 to Unit 6
- Installation of Flow Meters outside plant Water treatment plant – ESKOM KRIEL POWER
- Installation and Commissioning of Ash Hoppers Temperature and Level instruments at Unit 1- SEKOM KRIEL POWER
- Manufacture and Installation of Ash Load piping at the six pack for Ash trucks loading – ESKOM MAJUBA POWER
- Installation of Q-Decking on main silo coal overland conveyor and ash overland conveyors – ESKOM MAJUBA POWER
- Auxiliary Unit transformers cabling from Unit 2 to Unit 6 – ESKOM KRIEL POWER